Factory, Offices and Warehouse Refurbishment

Image for Factory, Offices and Warehouse Refurbishment

ROTORK


the brief.

Full M&E services design involved in the complex refurbishment of an old industrial building with a floor area in excess of 7000m2 ,into a state-of-the-art automatic manufacturing and process facility, office and warehouse.

the outcome.

BJP designed a system using concealed 4-pipe fan coils for heating and cooling with efficiencies of 90%. High level convections heaters, served at low temperatures from the condensing boilers in the warehouse, could also be used as desertification fans and very in speed to conserve power and heat. 

High efficiency lighting and controls were used throughout the office and factory areas. Specialist scene control lighting was used in the boardroom, demo and training rooms.  

BJP worked closely with the Client and contractors during the construction period to ensure the building was delivered on time and on budget. At completion the previously dilapidated building had been transformed into a stylish modern office with efficient manufacturing, process and storage facility.

Client
Architect

Project Sectors