St Margarets Hall

Image for St Margarets Hall

This Contract comprised of the remodelling and refurbishment of the internal layout including the existing multipurpose hall and surrounding room areas. The works also included the formation of the ground, upper ground and first floor level at the rear of the building and new extension at first floor level on the front elevation.

The Contract included the remodelling and improvements to the Mechanical and Electrical Services within these room areas and alterations to the main incoming low voltage electrical supply and telecommunication incoming service. An electrically driven retractable seating system was integrated in the main hall.

Part way through the project the building was flooded, and BJP further developed the designs to become more flood resistant in the future.

Throughout the duration of the works, the attached Town Council Offices remained fully occupied and operational.

Expertise Provided by BJP

  • Alterations To The Incoming Overhead Electrical Supply And Telecommunication Service Connection
  • Distribution And Metering
  • Small Power Installation
  • Internal Lighting And Emergency Lighting
  • External Lighting
  • Fire Alarm System
  • Hot and Cold Water Services
  • Integration of a Hi-Spec Stage Lighting Gantry and Stage Lighting System
  • Heating Modifications including Re-Use of Cast Iron Radiators
  • Retractable Seating Installation
  • Stage Lighting Installation
  • Natural and Mixed Mode Ventilation Services including Heat Recovery
  • Above Ground Drainage including Anti Flood Measure