Education
-
Bath School of Art and Design
This Contract formed the Second and Third floor refurbishment works of Bath Spa University College Sion Building.
Read more -
Castle School, Taunton
This Project provides Castle School with a New Post-16 Vocational Training Centre, incorporating an extension to the existing Jubilee Building teaching block to create four additional classrooms.
Read more -
Chaddlewood Primary School, Plympton
This Contract encompasses the construction of four new Key Stage 1 Classrooms and amendments to existing structures to create Reception, Library Resource, Administration and New Children’s Centre.
Read more -
Charlton Wood Primary Academy, Bristol
BJP was commissioned to provide early conceptual strategies for the Local Authority to develop a design for a new primary school.
Read more -
Chieveley Primary School, West Berkshire
This Project encompassed the extension and upgrade of an existing Victorian building and the construction of another standalone classroom and foundation blocks.
Read more -
Churchfields Academy
Salcombe Building consisted of a 3 storey construction within a recently created Academy in the Old Town area, built in the mid 1960’s of concrete construction. The original electrical installation was found to be in a poor state and recent periodic inspections recommended immediate wholesale replacement. The accommodation comprised of teaching areas and staff accommodation […]
Read more -
Churchill Community School, Somerset
This Project encompassed the extension of the existing Drama Studio to form a new Dance Studio, a Recording Studio Suite, three Art Studios and a Dark Room.
Read more -
Clevedon Community School
The Project included the demolition of the existing wooden changing rooms at the School and the construction of a new stand-alone sports pavilion and modern changing facility.
Read more -
Hermitage Primary School
This Contract was to build a single storey extension to house five new classrooms, enlarged school office/finance office and new staff room facilities.
Read more -
Learning Resources Building
This building was designed for teacher training and includes many facilities including workshops, art studios, laboratories, IT class- rooms etc.
Read more -
Loxton Road Classrooms, Weston College
The central library required a complete refurbishment, expanding the size of the library and removing the outdated building services. Several new IT spaces were created and new lighting and data was required throughout.
Read more -
Notre Dame R.C. School, Plymouth
This Contract encompassed the construction of a new sports building and classroom block.
Read more -
Renault Garage, Weston College
The Renault Garage was a car showroom bought by Weston College to turn into a teaching classroom. The new classroom would house cars, lifting equipment, compressed air and all associated tools.
Read more -
Sacred Heart Roman Catholic Primary School, Paignton
This Contract encompasses the provision of all of the Engineering Services for the proposed classroom amendments and new classroom build.
Read more -
Sky College, Taunton
This Project included Refurbishment of an Existing Block, new Offices, Entrance, Classroom Block and Sports Barn, an extension of the existing Lounge, and Re-arranging the First Floor.
Read more -
St Francis CofE VA Primary School, Swindon
New two storey School extension consisting of Classrooms, Community, Group, Coat, Hygiene, Store and Plant Rooms, Office and Circulation areas, including alteration to the existing School Hall, Kitchen and Staff Room.
Read more -
St John’s Roman Catholic Primary School, Tiverton
This Contract encompasses the provision of a New Boiler Installation at St John’s Catholic Primary School, Tiverton.
Read more -
St John’s School, Bath
The School, with an occupancy of 315 students, includes eleven classrooms with kitchen facilities and Astroturf sports pitch.
Read more -
St. Bonaventure’s Roman Catholic Primary School
This project was installing a Bio-mass Wood Pellet Boiler, a new Plantroom, Passive Ventilation to Classrooms, Rainwater Harvesting, 14 Classrooms, Commercial Kitchen and a Floodlit Astroturf Pitch.
Read more -
St. Louis Catholic Primary School, Frome
This Contract encompasses the provision of all the Engineering Services for a new School Hall and Office facility together with the internal re-modelling of Staff Room, Toilets and Offices.
Read more -
The HUB, Weston College
The HUB is a large two floor teaching block built to replace an old out of date building. BJP carried out a full design of the M&E services associated with the new building
Read more -
The Space Performing Arts Centre
The Space is a specialist Theatre School situated next to the existing Heathfield School Tacci – Morris Centre.
Read more -
Theale Green Community School
This building, requiring a BREEAM excellent rating, created dedicated sixth form facilities’ at First Floor level and general teaching spaces at Ground Floor level
Read more -
Wells Cathedral School
Erection of a New Maths Classroom Block on the land adjoining the existing Bursary and Library.
Read more -
Westonbirt School
BJP was commissioned to oversee the design and implementation of “State of the Art” sports facilities for this prestigious Public School.
Read more -
Writhlington School Fire Damage
BJP were called in to carry out an insurance assessment of the damage caused by fire and smoke. The school asked BJP to redesign the M&E services for the refurbishment works.
Read more