Government and Commercial
-
Barton Hill Settlement
The Barton Hill Settlement acts as both a community centre for local residents and a drop in centre for people with drug addictions. The centre lies in the centre of Bristol and due to limited funding the centre’s main buildings had become very run down over the years. The Settlement was able to raise capital […]
Read more -
GE Aviation Cheltenham EPIC
The Electrical Power Integration Centre (EPIC) building involved the conversion of an existing 1940’s structure into a world leading aircraft electrical systems testing and development centre.
Read more -
H.M. Prison Service – Safer Custody Project
As part of the Prison Service initiative to reduce suicide and self harm in custody, BJP was appointed to advise the “Safer Custody Group” on the engineering services aspects.
Read more -
HM Prison Bristol
BJP was appointed to provide a security upgrade for Her Majesty’s Prison in Bristol.
Read more -
HM Prison Eastwood Park
BJP was commissioned by Her Majesty’s Prison Service to undertake the mechanical and electrical services design for the Mother and Baby Unit at HMP Eastwood Park.
Read more -
New Offices and Laboratory Facilities
BJP undertook the full detailed design for the development of a world leading centre to develop specialist scientific equipment used in industries such as mining. The Company decided to expand their head offices with the construction of a new two-floor building containing both offices and laboratories. BJP was appointed to carry out a full design […]
Read more -
Renault Garage, Weston College
The Renault Garage was a car showroom bought by Weston College to turn into a teaching classroom. The new classroom would house cars, lifting equipment, compressed air and all associated tools.
Read more -
Rotork Bath
The project brief was to refurbish the entire building and to replace the roof of the warehouse in order to increase the storage volume.
Read more -
St Margarets Hall
This Contract comprised of the remodelling and refurbishment of the internal layout including the existing multipurpose hall and surrounding room areas. The works also included the formation of the ground, upper ground and first floor level at the rear of the building and new extension at first floor level on the front elevation. The Contract […]
Read more -
VOSA Avonmouth
As the commission was for a number of similar buildings, BJP took the initiative to create a model ‘project’ whereby the major design decisions could be properly evaluated and discussed with the Client prior to commencing with the building designs.
Read more -
VOSA Carlisle
In a further response to VOSA’s demand for innovation, the Carlisle Heavy Goods Vehicle Testing Station incorporates a unique heat pump, heat recycling system.
Read more -
VOSA Offices
As the commission was for a number of similar buildings, BJP took the initiative to create a model ‘project’ whereby the major design decisions could be properly evaluated and discussed with the Client prior to commencing with the building designs.
Read more -
VOSA Stack Vent
One of the many measures developed by BJP, was the introduction of passive stack ventilation in lieu of the unitary air conditioning that had previously been used by the Agency
Read more -
VOSA Trust Partnering Team
The Client chose to procure this development programme using a Partnering Agreement whereby the professional and construction teams work together in a fully transparent, open book environment of co-operation.
Read more