Healthcare
-
Barton Hill Settlement
The Barton Hill Settlement acts as both a community centre for local residents and a drop in centre for people with drug addictions. The centre lies in the centre of Bristol and due to limited funding the centre’s main buildings had become very run down over the years. The Settlement was able to raise capital […]
Read more -
Bath Clinic Power Supply and Theatre Upgrades
BJP was appointed as both Consultant and Project Manager, to undertake power supply and theatre upgrades in this working hospital.
Read more -
BMI Bath Clinic Courtyard Extension
This Contract encompassed the provision of the mechanical and electrical services associated with the development of The Clinic to construct the Courtyard Extension along with the refurbishment of the Reception Area.
Read more -
BRI, GP Support Unit
This Project comprised the internal refurbishment and alterations to create a remodelled GP Support Unit.
Read more -
BRI, Sleep Unit & Medical Physics
This Project comprised of the internal refurbishment and alterations to create a new Sleep Unit on Level 4 and an area for Medical Physics on Level 5.
Read more -
Bristol Children’s Hospital – Paediatric Cardiology
This Project comprises minor alterations and remodelling of the Paediatric Cardiology Unit, located in the Children`s Hospital Level 3 on the Bristol Royal Infirmary site.
Read more -
Bristol Children’s Hospital – Renal RO Pure Water
This Project encompasses the provision of all of the Engineering Services for supply and installation of mechanical services associated with the installation of new water services.
Read more -
Facial Surgery and Orthodontics Department
New Facial Surgery and Orthodontics Suite occupying two levels above the Lansdown Restaurant within the existing Royal United Hospital, Bath.
Read more -
Frenchay Hospital – Intensive Care Unit
This Project involved the construction (extension to existing) of a new four-bedroom wing consisting of individual isolation rooms and included alterations and refurbishment to areas of existing ward and associated rooms.
Read more -
Longfox High Dependency Unit
The High Dependency Unit was extended to provide additional Male and Female accommodation in accordance with the latest Building Regulations.
Read more -
Petherton Resource Centre
The original building was refurbished and a new structure built to provide Healthcare, Administration and support based accommodation.
Read more -
Ross on Wye Hospital – Endoscopy Facility
This Project encompassed the refurbishment and remodelling of the existing Endoscopy Department.
Read more -
Royal United Hospital, Bath – Dermatology Unit
This Contract provided the complete remodelling of Hamilton Ward, located on Level 2, within Block 44 of the operational South Building of the Bath Royal United Hospital to form the Dermatology Clinic.
Read more -
Royal United Hospital, Bath – Victoria Ward
This Contract provided the complete remodelling of Victoria Ward, to form facilities for the relocation of the Chest Pains Unit, MSSU Department and associated administration and support services.
Read more -
RUH Medical Record Store
BJP were commissioned to initially appraise the large business unit identified by the Royal United Hospital for a medical records archive. The shell was designed by BJP to provide a suitable engineered environment for the safe storage of long term paper records. BJP operated as contract administrator and project managed the works from design, tender […]
Read more -
RUH Urgent Care Centre
This project involved creating a new department in the A&E area of the Hospital utilising an infill section between the waiting areas. The department required many service elements to support the varied medical assessment needs of the provider from the North of the UK. The project provided many challenges to ensure the facility was opened […]
Read more -
Sandalwood Court
This Contract encompassed the provision of Mechanical and Electrical Services associated with the refurbishment of a Mental Healthcare Centre in Swindon.
Read more -
South Bristol Walk-In
BJP was commissioned by Avon Area Health Authority to undertake services design work for the Walk-in Health Centre building on the Knowle West Health Park in Bristol.
Read more -
Southmead HDU
The High Dependency Unit (HDU) was constructed alongside the existing Weston Ward Block at Southmead Hospital, Bristol.
Read more -
Southmead IVF Centre
BJP was commissioned by North Bristol NHS Trust to undertake the engineering services for the new IVF Centre, Southmead Hospital, Bristol. The works were to be carried out in Three Phases.
Read more -
Southmead MBU
The New Mother and Baby Unit (MBU) was constructed alongside the existing Gloucester House Administration Block at Southmead Hospital, Bristol.
Read more -
St Michaels Hospital
Wards 72 & 78 This Contract comprised the remodelling of the existing Wards 72 and 78 at St Michaels Hospital in Bristol to create a Short Stay Unit (Ward 78 – Level C) and Maternity Led Unit Ward 72 (Level E), the project included an extension to the existing Theatres Recovery Room Ward on level […]
Read more -
Wellspring Healthy Living Centre
This building was constructed with the intention to create a unique Community Centre as the focal point for healthcare weith new and existing services.
Read more -
Western Zone Redevelopment
The construction of this building, provides for the Gloucester NHS Foundation Trust, new clinic facilities on the Ground Floor with offices on the two floors above.
Read more -
Yeovil Womens Hospital Phase 1
The Project encompassed the Engineering Services for Phase One of the Remodelling of The Women’s Hospital.
Read more